NTPC Limited, India's largest integrated power utility, is driving the nation's progress with an installed capacity of 83 GW and a strong presence across the entire power generation value chain. As we set our sights on an ambitious 150 GW capacity by 2032, we are looking for talented and passionate individuals to contribute to our nuclear power capacity addition journey.
Q1: What is the last date to apply?
A1: The last date will be notified later.
Q2: What are the qualifications required?
A2: Most positions require a B.E./B. Tech degree in the relevant discipline.
Q3: How can I apply for these posts?
A3: Applications will be accepted through the official link provided above.